Rock excavation for 84″ storm drainage install scheduled to begin 4/24/2023 near the cliff in the area of 5th Street and Cliff Road (see attached map and reference Housing Map Area A1).
Rock excavation for 84″ storm drainage install scheduled to begin 4/24/2023 near the cliff in the area of 5th Street and Cliff Road (see attached map and reference Housing Map Area A1).