ANNOUNCEMENTS

11/29/2023 – See Project Updates for details on road closures.

11/29/2023 – Construction continues for new water, electrical, telecom and storm drainage.

Friendly Reminder: Deep excavations are present in multiple areas. Please keep clear of fenced areas and moving equipment outside of fenced areas.

PROJECT UPDATES

Housing Demolition

Housing Demolition

Multiple buildings on NE Road have been removed. The concrete material from the demolition is being crushed into an aggregate basecourse that will be reused on-site. Reuse, recycle, and reduce the waste for a better future.

ABOUT THE PROJECT

In September 2017, Base Detachment Borinquen (BDB) and Air Station Borinquen (ASB) suffered extensive damage to its many facilities from Hurricanes Irma and Maria. This damage severely affected the Coast Guard’s ability to efficiently perform its missions, such as, search and rescue, law enforcement, aerial support for navigation aid, and logistics support. In addition to the damage, many structures and utilities at the base are dated and no longer serve their intended purpose or retain their proper function after a major event, such as a hurricane. The scope of work for this project therefore includes electrical and telecommunications distribution, water distribution, storm water improvements, sanitary sewer improvements, other site improvements and demolition, Coast Guard Exchange (CGX) resiliency repairs, and water and electrical resiliency.

SAFETY

Nova Group, Inc. recognizes the importance of safety on every construction project and fosters a “zero unsafe acts” attitude at all job sites. The company has an active and comprehensive accident prevention policy to ensure it can operate successfully in the inherently hazardous construction industry. The safety plan receives focused input from every level of the company starting with the President and includes each person working on a Nova project.

Aware that safety is an ongoing team effort, Nova has taken steps to optimize participation and compliance. One of those steps is an incentive program that recognizes outstanding safety performance. The goal of the program is to improve all employees’ safety awareness, and reward those who adhere to strict policies and procedures. A comprehensive safety-training program provides all craft employees with an eight-hour safety orientation; supervisors (fore level through project management) receive a 40-hour supervisor course. Both are accredited by the National Center for Construction Education and Research.

PROJECT PHOTOS

MEET THE TEAM

Project Manager: William Wells

Project Superintendent: Christin Hodgkinson

Project Quality Control: Nicholas Nguyen

Site Safety and Health Officer: Art Mendoza

Designers of Record:

ADC Engineering

Newcomb & Boyd

Ardurra

LS3P

Industry Partners – Lord Construction

Senior Project Manager: Jose (Andy) Mendez

CSA Project Manager: Alex Diaz

Electrical Project Manager: Gustavo Guzman

Mechanical Project Manager: Efrain Rivera

Field Project Engineer #1: Manuel Martinez

Field Project Engineer #2: Javier Alvarez

Field Project Engineer #3: Jose Marrero

 Field Office Manager: Carolyn Rodriguez

FEEDBACK

We want to hear from you! Click below to email us:

Nova Office

Nova Group, Inc.
185 Devlin Road
Napa, CA 94558
Main Phone(707) 265-1100
Main Fax: (707) 265-1199
www.novagrp.com

Caddell Nova Office Aguadilla

Cliff Rd. Construction Trailer
Bldg. 822
Aguadilla, Puerto Rico 00603
Phone: 707-815-7565